Brush coating method: brush coating, roll coating, spraying
Appearance color: yellow green
Luminous color: yellow-green, blue-green
Applicable surface: cement concrete, metal, wood, etc
Note: Pay attention to the treatment of the base surface, and the construction dosage should not exceed 0.2kg/m2 per pass
Shelf life: 12 months
Matters needing attention
1. Suitable for spraying, brush coating, roll coating, adding water to adjust the viscosity according to the construction process, adding water should not exceed 5%;
2. Avoid noon during construction to prevent direct sunlight from hitting the ground;
3. Drying time: standard thickness single coating, 25℃, surface drying ≤45 minutes, practical drying ≤6 hours;
4. Single-layer dosage of 200g/m2, each layer construction interval of 2h (coating surface can be dry, 2h is absolutely safe, and related to construction temperature and humidity), the surface temperature is not higher than 60℃, according to the ratio of use of curing agent;





Reviews
There are no reviews yet.